General Requirements for Modular
Homes and Modular Commercial
- South Carolina State Law requires that all modular structures or components be built by a South Carolina Licensed Modular Building Manufacturer and labeled by the South Carolina Building Code Council before being installed.
- Modular buildings must meet the 2006 International Building Code for 1 & 2 family dwellings.
- Modular buildings must be certified by the South Carolina Building Codes Council showing that they have been manufactured by an approved compliance assurance program.
City of Conway Permitting Requirements For Modular Homes
- Furnish 1 set of complete plans from the manufacturer with original S.C. Structural Engineers Seal. They must be properly signed and showing that the structure meets wind gust loads of the 2006 International Residential Building Code for 1 & 2 family dwellings. Copies of Engineers Seals will not be accepted.
- Furnish a site plan showing the modular building located on site with the proper set backs from each property line as required by the City of Conway Planning Department.
- Furnish 1 set of drawings showing the footing and foundation as engineered by a S.C, Registered Engineer. Mobile home tie downs will not be accepted.
- Third party inspection certificates will not be acceptable in lieu of Engineers Seals.
- Modular buildings must be erected on-site by a S.C. Licensed Residential Builder or a General Contractor who is properly licensed by the state. South Carolina Specialty Contractors who are registered only are not allowed to construct modular buildings footing / foundation on site.
- The City's permit and plan review fees are based on the total cost of the building, including footing and foundation installation.
- Water and sewer tap fees are to be paid prior to the issuance of permit. Contact Freddie Dubose, Public Utilities Director, for the cost of these fees @ 248-1770.
- Driveway and lot drainage is to be approved by Jerry Barnhill, Public Works Director, @ 248-1730.
- Grand Strand Water and Sewer should be contacted if located in their service
area.
- When all data is received and a permit application is filled out the permit process and plan review will be made. Please allow up to 14 days to process the permit application.
General Requirements for Modular Commercial Buildings
- South Carolina State Law requires that all modular structures or components be built by a South Carolina Licensed Modular Building Manufacturer and labeled by the South Carolina Building Code Council before being installed.
- Modular buildings must meet the 2006 International Building, Plumbing, Mechanical and Gas Codes as well as the 2008 National Electric Code.
- Modular buildings must be certified by the South Carolina Building Codes Council that they have been manufactured by an approved compliance assurance program.
City of Conway Permitting Requirements
- Furnish 1 set of complete plans from the manufacturer with original SC Structural Engineers Seal. They must be properly signed and showing the structure meets the wind loads of the 2006 International Building Code.
For the City of Conway, copies of engineer seals will not accepted.
- Furnish a site plan showing the modular building located on site with the proper set backs from each property line as required by the City of Conway Planning Department.
- Furnish 1 set of drawings showing the footing and foundation as engineered by a SC Registered Engineer. Mobile home tie downs will not be accepted.
- Third party inspection certificated will not be acceptable in lieu of Engineer Seals.
- Modular buildings must be erected on-site by a SC Licensed General Contractor who is properly licensed by the state. South Carolina specialty contractors who are registered only are not allowed to construct modular buildings footing/foundation on site.
- The city’s permit and plan review fees are based on the total cost of the building including footing and foundation installation.
- Water and sewer tap fees are to be paid prior to issuance of permit. Contact Freddie Dubose, Public Utilities Director, for the cost of these fees @ 248-1770.
- Driveway and lot drainage is to be approved by Jerry Barnhill, Public Works Director, @ 248-1770.
- When all data is received and a permit application is filled out the permit process and plan review will be made. Please allow up to 10 days to process the permit application.